Confirm with the LHCb team if the option of reduced scan range is viable, and report on the final result of the tolerances analysis and chosen option for the vdM optics.

Confirm with the LHCb team if the option of reduced scan range is viable, and report on the final result of the tolerances analysis and chosen option for the vdM optics.
Action information
Completed ?
From LMC
451
Assignees
LPC LHCb collaboration
Action details
Comments