Produce a planning for a combined TIM and battery BLM test campaign in view of the Pilot Beam Test and Run3, reporting back to the LMC with the final proposal.
Action information
Completed ?
From LMC
423
Assignees
SY-BI BE-CEM EN-ACE BE-OP
Action details
Comments
Circulate ECR (EDMS 2617044) for approval by the LMC.
Action information
Completed ?
From LMC
423
Assignees
BE-EA EN-ACE
Action details
Comments
To define a new date for the SR4 transformer replacement (after the Pilot Beam Test).
Action information
Completed ?
From LMC
422
Assignees
EN-EL BE-OP EN-ACE SY-RF
Action details
Comments
Update the LS2 and YETS schedules to be consistent with the 6.8 TeV energy target.
Action information
Completed ?
From LMC
419
Assignees
EN-ACE BE-OP
Action details
Comments
Clarify impact of LHC schedule change on the Injector schedule.
Action information
Completed ?
From LMC
416
Assignees
EN-ACE BE-OP
Action details
Comments
Report back on the advancement of the MB.B28L8 replacement.
Action information
Completed ?
From LMC
416
Assignees
EN-ACE TE-MSC
Action details
Comments
Follow-up of the 11L4 misalignment in Sector 34 and its potential impact on the machine aperture.
Action information
Completed ?
From LMC
409
Assignees
BE-ABP BE-GM EN-ACE TE-MSC
Action details
Comments
Define with the concerned groups a plan for the interventions and mitigations of the Schneider M580 PLC issues - after the LHC schedule is updated at the discussion with the experiments on March 15th.
Action information
Completed ?
From LMC
412
Assignees
BE-ICS EN-ACE
Action details
Comments
Follow-up of the proposed mitigation measures to minimize the risk of accidental venting of the LHC vacuum sub-sectors.
Action information
Completed ?
From LMC
412
Assignees
TE-VSC EN-ACE
Action details
Comments