Report back on M1B2 cryomodule performance with beam.
Comments
Action closed after email conversation of 2023.01.31 (see below).
Hi Giulia,
from Andy Butterworth:
"The procedure for the renaming of the power converter in the RF control system is now documented in the EPC procedure as well as in the RF wiki.
After an exchange of power converter the HL RF piquet will contact an RF controls expert to make the change. No other controls modifications (LSA etc.) are necessary."
MTP request under discussion.