Confirm with the LHCb team if the option of reduced scan range is viable, and report on the final result of the tolerances analysis and chosen option for the vdM optics.
Follow up with the IWG of implications of the non-conformity of the VELO WFS, namely by exploring the possibility to inspect regularly the status of the WFS and the feasibility to repeat the cold welds test with electric current flowing on the WFS.