LHCb collaboration

LHCb collaboration

Report in due time on the Phase II vacuum recovery of the LHCb VeLo.
Action information
Completed ?
From LMC
456
Assignees
LHCb collaboration TE-VSC
Action details
Comments
Confirm with the LHCb team if the option of reduced scan range is viable, and report on the final result of the tolerances analysis and chosen option for the vdM optics.
Action information
Completed ?
From LMC
451
Assignees
LPC LHCb collaboration
Action details
Comments
Report back on the LHCb VeLo status and installation plan at the next LMC on April, 13th.
Action information
Completed ?
From LMC
436
Assignees
LHCb collaboration
Action details
Comments
Report on the results of the cold weld tests carried out with EN-MME-MM.
Action information
Completed ?
From LMC
422
Assignees
LHCb collaboration
Action details
Comments
Follow up with TREX for the preparation of procedures for possible interventions on the the VELO Wake Field Suppressor.
Action information
Completed ?
From LMC
422
Assignees
LHCb collaboration TREX TE-VSC
Action details
Comments
Follow up with the IWG of implications of the non-conformity of the VELO WFS, namely by exploring the possibility to inspect regularly the status of the WFS and the feasibility to repeat the cold welds test with electric current flowing on the WFS.
Action information
Completed ?
From LMC
422
Assignees
LHCb collaboration IWG
Action details
Comments