Report back on the anomalies suspected on the circuit for RQ5.LR3.
Comments
Actions have been defined and implemented, in particular continuous monitoring during SVC activation.
https://edms.cern.ch/document/1109054/8.5 (info provided by M. Cerqueira Bastos via email on 27.05.2024.
Email by M. Cerqueira Bastos on 2023.06.07 (closed together with twin action on LMC 467)
from Andy Butterworth:
"The procedure for the renaming of the power converter in the RF control system is now documented in the EPC procedure as well as in the RF wiki.
After an exchange of power converter the HL RF piquet will contact an RF controls expert to make the change. No other controls modifications (LSA etc.) are necessary."
Archive at the end of year (last meeting of the year).