SY-STI

SY-STI

Report back on the preferred option (internal or external contract) for the ex-operational B1 dump autopsy.
Action information
Completed ?
From LMC
417
Assignees
SY-STI
Action details

M. Calviani (2021.07.16): This is an ongoing activity that will be confirmed in September/October ’21 in a dedicated review. But I think we can realistically say that the preferred option is currently the internal one.

Comments
Report back on the B1V and B2V goniometer post-mortem tests.
Action information
Completed ?
From LMC
413
Assignees
SY-STI BE-CEM
Action details

Marco Calviani (2021.07.16): "I would move this to Feb/Mar 2022, as the new gonios are planned to be installed during YETS21-22. We give priority to the installation of the equipment and then we will do the post-mortem. It may take a while depending on whether there is any “major” culprits or we have to take some time to analyze their behavior."

 

This was closed ex officio by the Chairs on the 1 June 2023: the action was superseded by the recent problem with the new crystal collimator and, to optimize the resources, it was decided to close it.

Comments