Actions
Actions list
Assignees Action title Status Open Close ID
EN-EL, TE-VSC, TE-CRG Investigate a redundant solution to ensure the availability of the pumping of the insulation vacuum of the Point 5 triplet. LHC Machine Committee (LMC #487) 181
EN-MME, TE-VSC Report back on the warm module x-rays performed during TS1. LHC Machine Committee (LMC #487) LHC Machine Committee (LMC #488) 180
LBOC, BE-ABP, SY-STI Study mitigation strategies to reduce FASER and SND background. LHC Machine Committee (LMC #487) 178
SY-BI, HSE-RP Investigate the possibility to install additional instrumentation to identify the source of muons for the FASER and SND background. LHC Machine Committee (LMC #487) LHC Machine Committee (LMC #489) 179
Task force on the Edge Welded Bellows Report to the Committee the present status of the investigation. LHC Machine Committee (LMC #486) 177
LBOC, MPP Evaluate if a minimum set of validation checks is required after the polarity changes of LHCb spectrometers. LHC Machine Committee (LMC #486) 175
BE-OP, SY-BI Commission blindable BLMs in the injection region (Point 2 and /оr 8). LHC Machine Committee (LMC #486) 176
BE-OP Explore the possibility to verify SPS transverse bunch oscillation before extraction to the LHC. LHC Machine Committee (LMC #484) LHC Machine Committee (LMC #485) 174
LBOC, MPP Depending on the 2024 operational experience with the TDIS temperature interlock, define a strategy for the TDIS opening throughout the operational cycle to maximize the bellow lifetime, with input from SY-STI and IWG. LHC Machine Committee (LMC #483) LHC Machine Committee (LMC #484) 173
LS3C Follow-up on the return of experience of the YETS 2023-24 and items remaining from YETS 2022-23. LHC Machine Committee (LMC #482) 172
LBOC Report back on the final choice of the initial collision beta* for the 2024 pp run. LHC Machine Committee (LMC #481) LHC Machine Committee (LMC #483) 170
LMC Chairs, ATS management Decide on the cryogenic configuration for the 2024 ion run. LHC Machine Committee (LMC #481) 171
ATS Safety Meeting Follow-up on SR buildings access constraints and co-activities during HWC. LHC Machine Committee (LMC #480) 169
TE-VSC, EN-ACE Add the ZDCs constraints to the bake-out procedures and to scheduling planning. LHC Machine Committee (LMC #479) 166
IWG, BE-ABP Report back on limits for MDs in 2024, after the input from LSWG is received. LHC Machine Committee (LMC #479) LHC Machine Committee (LMC #485) 165
SY-ABT, TE-VSC Report back on the final solution for operating the vacuum interlock of the MKIs in 2024. LHC Machine Committee (LMC #479) LHC Machine Committee (LMC #481) 168
TREX, LS3C Propose a strategy for an optimal information flow to coordinate machine and experiment activities during the long shutdowns and end of year stops. LHC Machine Committee (LMC #479) LHC Machine Committee (LMC #483) 167
LMC Define a strategy for increasing bunch intensity in 2024. LHC Machine Committee (LMC #478) LHC Machine Committee (LMC #479) 164
TE dept Put in place a structure to review the RF finger issues involving all the stakeholders. LHC Machine Committee (LMC #477) 162
LMC Define a global strategy for increasing the beam and bunch intensity in 2024 and investigate the possibility of running with degraded vacuum conditions due to an RF finger issue. LHC Machine Committee (LMC #477) LHC Machine Committee (LMC #479) 163
LMC Chairs Consider a global coordination of information and issues related to bellows in the LHC machine. LHC Machine Committee (LMC #477) LHC Machine Committee (LMC #480) 161
BE-OP GL, Energy coordinator Report on the cost and constraint to schedule the LHC YETS 2024-25 start two weeks before End-Of-Year Closure. LHC Machine Committee (LMC #476) LHC Machine Committee (LMC #481) 159
TE-VSC, LHCb VeLo team Document and provide training to the relevant teams about the sequence of actions to be taken for the different failure scenarios of the VeLo vacuum system. LHC Machine Committee (LMC #476) 160
EN-EL Follow-up on the planning and impact of the power cut during the AUG tests on machine equipment. LHC Machine Committee (LMC #476) LHC Machine Committee (LMC #477) 158
RF Burst Disc Task Force, LHC CSAP Review the access conditions around the fast-depressurizing valves on the ACS cryomodules. LHC Machine Committee (LMC #475) LHC Machine Committee (LMC #478) 157
TE-VSC, EN-ACE, BE-OP Schedule an X-rays analysis of the IR5 RF finger warm modules at the earliest opportunity. LHC Machine Committee (LMC #466) LHC Machine Committee (LMC #474) 156
MPP Comment on the possibility to test and operationally deploy blindable BLMs, in the injection region and in Point 7. LHC Machine Committee (LMC #466) LHC Machine Committee (LMC #486) 154
LBOC Follow up and report back on the understanding of losses during injection. LHC Machine Committee (LMC #466) 153
TDIS Task Force Report back the TDIS beam screen heating effects findings after summer 2023. LHC Machine Committee (LMC #466) LHC Machine Committee (LMC #486) 155
SY-STI Report on the understanding of the observations of the TDIS temperature issue and come back with a strategy to alleviate the TDIS interlock limitation. LHC Machine Committee (LMC #465) LHC Machine Committee (LMC #466) 150
LHC CSAP, BE-OP-TI Clarify access rules when the tunnel ventilation is in a degraded mode of operation. LHC Machine Committee (LMC #465) 151
SY-EPC, EN-EL, BE-OP-TI Clarify and communicate the procedure for turning on the SVCs after a trip. LHC Machine Committee (LMC #465) LHC Machine Committee (LMC #487) 149
LPC, MPP Report back the final VeLo minimum gap strategy. LHC Machine Committee (LMC #465) LHC Machine Committee (LMC #466) 152
TE-VSC TE-VSC module task force to report back to LMC, including any possible intensity limitations, in due time. LHC Machine Committee (LMC #464) LHC Machine Committee (LMC #477) 147
BE-ABP Circulate new Reverse Polarity optics proposal to the experiments via LPC to evaluate their impact on the Forward Physics experiments. LHC Machine Committee (LMC #464) LHC Machine Committee (LMC #465) 148
SY-RF, EN-ACE, RF Burst Disc Task Force Investigate the preventive exchange of 2 burst discs during TS1. LHC Machine Committee (LMC #463) LHC Machine Committee (LMC #464) 145
RF Burst Disc Task Force Report back on the feasibility of installing a new control valve with full section opening to act in a similar way to the Warm Recovery Line. LHC Machine Committee (LMC #463) LHC Machine Committee (LMC #474) 146
MPP Confirm the procedure for the ramp up and minimum gap for the LHCb VeLo closing. LHC Machine Committee (LMC #463) LHC Machine Committee (LMC #465) 144
Run 3 Coordinators Distribute the actions collected from the YETS 2022-23 return of experience to the designated responsibles for follow-up. LHC Machine Committee (LMC #462) LHC Machine Committee (LMC #483) 143
Collimation team Understand the observed impact of the TCSPM.E5R7.B1 retraction on the B1H lifetime LHC Machine Committee (LMC #462) LHC Machine Committee (LMC #463) 142