Assignees Action title Status Open Close ID
TE dept Put in place a structure to review the RF finger issues involving all the stakeholders. LHC Machine Committee (LMC #477) LHC Machine Committee (LMC #503) 162
LMC Chairs Consider a global coordination of information and issues related to bellows in the LHC machine. LHC Machine Committee (LMC #477) LHC Machine Committee (LMC #480) 161
TE-VSC, LHCb VeLo team Document and provide training to the relevant teams about the sequence of actions to be taken for the different failure scenarios of the VeLo vacuum system. LHC Machine Committee (LMC #476) 160
BE-OP GL, Energy coordinator Report on the cost and constraint to schedule the LHC YETS 2024-25 start two weeks before End-Of-Year Closure. LHC Machine Committee (LMC #476) LHC Machine Committee (LMC #481) 159
EN-EL Follow-up on the planning and impact of the power cut during the AUG tests on machine equipment. LHC Machine Committee (LMC #476) LHC Machine Committee (LMC #477) 158
RF Burst Disc Task Force, LHC CSAP Review the access conditions around the fast-depressurizing valves on the ACS cryomodules. LHC Machine Committee (LMC #475) LHC Machine Committee (LMC #478) 157
MPP Comment on the possibility to test and operationally deploy blindable BLMs, in the injection region and in Point 7. LHC Machine Committee (LMC #466) LHC Machine Committee (LMC #486) 154
LBOC Follow up and report back on the understanding of losses during injection. LHC Machine Committee (LMC #466) 153
TDIS Task Force Report back the TDIS beam screen heating effects findings after summer 2023. LHC Machine Committee (LMC #466) LHC Machine Committee (LMC #486) 155
TE-VSC, EN-ACE, BE-OP Schedule an X-rays analysis of the IR5 RF finger warm modules at the earliest opportunity. LHC Machine Committee (LMC #466) LHC Machine Committee (LMC #474) 156
LPC, MPP Report back the final VeLo minimum gap strategy. LHC Machine Committee (LMC #465) LHC Machine Committee (LMC #466) 152
LHC CSAP, BE-OP-TI Clarify access rules when the tunnel ventilation is in a degraded mode of operation. LHC Machine Committee (LMC #465) 151
SY-STI Report on the understanding of the observations of the TDIS temperature issue and come back with a strategy to alleviate the TDIS interlock limitation. LHC Machine Committee (LMC #465) LHC Machine Committee (LMC #466) 150
SY-EPC, EN-EL, BE-OP-TI Clarify and communicate the procedure for turning on the SVCs after a trip. LHC Machine Committee (LMC #465) LHC Machine Committee (LMC #487) 149
BE-ABP Circulate new Reverse Polarity optics proposal to the experiments via LPC to evaluate their impact on the Forward Physics experiments. LHC Machine Committee (LMC #464) LHC Machine Committee (LMC #465) 148
TE-VSC TE-VSC module task force to report back to LMC, including any possible intensity limitations, in due time. LHC Machine Committee (LMC #464) LHC Machine Committee (LMC #477) 147
RF Burst Disc Task Force Report back on the feasibility of installing a new control valve with full section opening to act in a similar way to the Warm Recovery Line. LHC Machine Committee (LMC #463) LHC Machine Committee (LMC #474) 146
SY-RF, EN-ACE, RF Burst Disc Task Force Investigate the preventive exchange of 2 burst discs during TS1. LHC Machine Committee (LMC #463) LHC Machine Committee (LMC #464) 145
MPP Confirm the procedure for the ramp up and minimum gap for the LHCb VeLo closing. LHC Machine Committee (LMC #463) LHC Machine Committee (LMC #465) 144
Run 3 Coordinators Distribute the actions collected from the YETS 2022-23 return of experience to the designated responsibles for follow-up. LHC Machine Committee (LMC #462) LHC Machine Committee (LMC #483) 143
Collimation team Understand the observed impact of the TCSPM.E5R7.B1 retraction on the B1H lifetime LHC Machine Committee (LMC #462) LHC Machine Committee (LMC #463) 142
MP3 Implement an automatic measurement of the circuit resistance for comparisons to their reference values during HWC. LHC Machine Committee (LMC #461) LHC Machine Committee (LMC #467) 141
SY-EPC Implement the proposed changes to the procedures to avoid non-conformities similar to that of RTQX2.L5 reoccurring. LHC Machine Committee (LMC #461) LHC Machine Committee (LMC #467) 140
LPC, MPP Report back on the results of the VeLo tomography (400 bunches and 6.8 TeV fill) LHC Machine Committee (LMC #460) LHC Machine Committee (LMC #463) 139
TE-CRG, Energy Management Panel Establish the impact of excluding Point 4 from the economic mode configuration of the LHC cryogenic system, and report back with the recommendation. LHC Machine Committee (LMC #460) 138
RF Burst Disc Task Force Formalize the procedures for a prompt intervention of the specialists in the different He venting scenarios of the RF cavities. LHC Machine Committee (LMC #460) 137
RF Burst Disc Task Force Report back on the advancement on the investigations of the Point 4 event on April 1st, 2023 and the progress in the understanding the observed time delay between the release valves trigger and the premature rupture of the discs. LHC Machine Committee (LMC #460) LHC Machine Committee (LMC #463) 136
MPP, LBOC Confirm the possibility to use the Beam 2 BBLR wires in operation, and determine the additional commissioning time required. LHC Machine Committee (LMC #460) LHC Machine Committee (LMC #462) 130
SY-STI Notify everyone as soon as possible on the possibility to re-install the TCPCH.A4L7.B1, to be able to plan and start the bakeout of the vacuum sector. LHC Machine Committee (LMC #459) LHC Machine Committee (LMC #460) 131
LBOC, CMS Collaboration, Triplet Task Force Report back after the beam-based measurements for a decision on the need for additional correction. LHC Machine Committee (LMC #459) LHC Machine Committee (LMC #464) 132
LPC Quantify the effect of the crossing angle polarity change in IR1 on the FASER detector acceptance and on its overall performance. LHC Machine Committee (LMC #459) LHC Machine Committee (LMC #460) 134
Triplet Task Force Report on the impact of not performing the polarity inversion of the IR1 crossing angle in 2023. LHC Machine Committee (LMC #459) LHC Machine Committee (LMC #464) 133
SY-BI, BE-OP, EN-HE Agree on the notification line for removing the movable BLMs in the TCLD.A11R2.B1 and TCLD.A11L2.B2 regions before large equipment transport. LHC Machine Committee (LMC #459) LHC Machine Committee (LMC #461) 135
LBOC Follow-up the TDIS temperature increase and its correlation with beam presence. LHC Machine Committee (LMC #458) LHC Machine Committee (LMC #466) 127
SY-STI Report, in due time, the outcome of the quantitative assessments on the operational limits on the frequency of the beam dumps. LHC Machine Committee (LMC #458) LHC Machine Committee (LMC #470) 128
SY-EPC Report on the outcome of the investigation on the non-conformity in the Point 5 RTQX2 circuit. LHC Machine Committee (LMC #458) LHC Machine Committee (LMC #461) 129
SY-STI Prepare a spare collimator for the TCTV.4R1.B2. LHC Machine Committee (LMC #457) LHC Machine Committee (LMC #458) 126
SY-BI Prepare and circulate an ECR on the repair proposal of the TCT wire collimators. LHC Machine Committee (LMC #456) LHC Machine Committee (LMC #457) 122
LBOC Collect, analyze and discuss the TCLD.11.R2.B1 related beam observations. LHC Machine Committee (LMC #456) LHC Machine Committee (LMC #486) 123
LHCb collaboration, TE-VSC Report in due time on the Phase II vacuum recovery of the LHCb VeLo. LHC Machine Committee (LMC #456) LHC Machine Committee (LMC #457) 124