Following the recommendation of the Edge-Welded Bellows Task Force, ensure that the stroke of all LHC equipment is reduced to the minimum necessary.
Action information
Completed ?
From LMC
500
Assignees
LBOC
Action details
Comments
Prepare options and procedures for mitigating a failure of the first D1 module and report back to the LMC in due time.
Action information
Completed ?
From LMC
499
Assignees
LBOC
Action details
Comments
Track down the root causes of the observed lifetime improvement during the cycle before Stable Beams.
Action information
Completed ?
From LMC
490
Assignees
LBOC
Action details
Comments
Study mitigation strategies to reduce FASER and SND background.
Action information
Completed ?
From LMC
487
Assignees
LBOC BE-ABP SY-STI
Action details
Comments
Evaluate if a minimum set of validation checks is required after the polarity changes of LHCb spectrometers.
Action information
Completed ?
From LMC
486
Assignees
LBOC MPP
Action details
Comments
Depending on the 2024 operational experience with the TDIS temperature interlock, define a strategy for the TDIS opening throughout the operational cycle to maximize the bellow lifetime, with input from SY-STI and IWG.
Action information
Completed ?
From LMC
483
Assignees
LBOC MPP
Action details
Comments
Report back on the final choice of the initial collision beta* for the 2024 pp run.
Action information
Completed ?
From LMC
481
Assignees
LBOC
Action details
Comments
Follow up and report back on the understanding of losses during injection.
Action information
Completed ?
From LMC
466
Assignees
LBOC
Action details

Close at JAP23 workshop

https://indico.cern.ch/event/1337597/timetable/#20231205.detailed

 

Comments
Report back after the beam-based measurements for a decision on the need for additional correction.
Action information
Completed ?
From LMC
459
Assignees
LBOC CMS Collaboration Triplet Task Force
Action details
Comments
Confirm the possibility to use the Beam 2 BBLR wires in operation, and determine the additional commissioning time required.
Action information
Completed ?
From LMC
460
Assignees
MPP LBOC
Action details
Comments