Depending on the 2024 operational experience with the TDIS temperature interlock, define a strategy for the TDIS opening throughout the operational cycle to maximize the bellow lifetime, with input from SY-STI and IWG.
Comments
Close at JAP23 workshop
https://indico.cern.ch/event/1337597/timetable/#20231205.detailed
Closed at task force creation.
Added LBOC a posteriori as they follow up for the LMC.