Report back on the final solution for operating the vacuum interlock of the MKIs in 2024. Action information #168 Action Completed ? From LMC 479 Assignees SY-ABT TE-VSC Action details Comments
Add the ZDCs constraints to the bake-out procedures and to scheduling planning. Action information #166 Action Completed ? From LMC 479 Assignees TE-VSC EN-ACE Action details Comments
Document and provide training to the relevant teams about the sequence of actions to be taken for the different failure scenarios of the VeLo vacuum system. Action information #160 Action Completed ? From LMC 476 Assignees TE-VSC LHCb VeLo team Action details Comments
Schedule an X-rays analysis of the IR5 RF finger warm modules at the earliest opportunity. Action information #156 Action Completed ? From LMC 466 Assignees TE-VSC EN-ACE BE-OP Action details Comments
TE-VSC module task force to report back to LMC, including any possible intensity limitations, in due time. Action information #147 Action Completed ? From LMC 464 Assignees TE-VSC Action details Comments
Report in due time on the Phase II vacuum recovery of the LHCb VeLo. Action information #124 Action Completed ? From LMC 456 Assignees LHCb collaboration TE-VSC Action details Comments
Report on observed vacuum activities in IR4 (5R4.B2) and its correlation with measured dose. Action information #118 Action Completed ? From LMC 453 Assignees TE-VSC R2E LBOC Action details Added LBOC a posteriori as they follow up for the LMC. Comments
Report back on the vacuum issues in 5R4. Action information #116 Action Completed ? From LMC 452 Assignees TE-VSC Action details Better explained in action 118 (closed ex officio). Comments
Investigate any anomalous loss patterns from the Pilot Beam Test to possibly identify similar issues elsewhere than 21L3. Action information #54 Action Completed ? From LMC 428 Assignees TE-VSC BE-ABP Action details Comments
Follow up with TREX for the preparation of procedures for possible interventions on the the VELO Wake Field Suppressor. Action information #35 Action Completed ? From LMC 422 Assignees LHCb collaboration TREX TE-VSC Action details Comments