TREX

TREX

Propose a strategy for an optimal information flow to coordinate machine and experiment activities during the long shutdowns and end of year stops.
Action information
Completed ?
From LMC
479
Assignees
TREX LS3C
Action details
Comments
Coordinate the impact studies of the different specialists to verify that Option 2 (running in 2023 with damaged RF box) is a viable scenario from the machine perspective.
Action information
Completed ?
From LMC
456
Assignees
TREX
Action details
Comments
Verify temperature monitoring procedures and intensity limits during the beam commissioning phase in the present LHCb configuration without the VeLo Side A.
Action information
Completed ?
From LMC
435
Assignees
TREX
Action details

P. Collins' presentation on completion of VeLo installation

Comments
Follow up with TREX for the preparation of procedures for possible interventions on the the VELO Wake Field Suppressor.
Action information
Completed ?
From LMC
422
Assignees
LHCb collaboration TREX TE-VSC
Action details
Comments