SY-STI

SY-STI

Investigate the impact of both H and V crossing plane options on the TCL mitigation strategy for LHCb. Report back to LMC in view of possible TCL procurement by the end of 2025.
Action information
Completed ?
From LMC
Assignees
SY-STI
Action details
Comments
Study mitigation strategies to reduce FASER and SND background.
Action information
Completed ?
From LMC
487
Assignees
LBOC BE-ABP SY-STI
Action details
Comments
Report on the understanding of the observations of the TDIS temperature issue and come back with a strategy to alleviate the TDIS interlock limitation.
Action information
Completed ?
From LMC
465
Assignees
SY-STI
Action details
Comments
Notify everyone as soon as possible on the possibility to re-install the TCPCH.A4L7.B1, to be able to plan and start the bakeout of the vacuum sector.
Action information
Completed ?
From LMC
459
Assignees
SY-STI
Action details
Comments
Report, in due time, the outcome of the quantitative assessments on the operational limits on the frequency of the beam dumps.
Action information
Completed ?
From LMC
458
Assignees
SY-STI
Action details
Comments
Prepare a spare collimator for the TCTV.4R1.B2.
Action information
Completed ?
From LMC
457
Assignees
SY-STI
Action details
Comments
Report on the source of the TDIS misalignment.
Action information
Completed ?
From LMC
441
Assignees
SY-STI
Action details
Comments
Report back on the follow-up of recommendations from the Technical Review of the LHC External Beam Dump.
Action information
Completed ?
From LMC
430
Assignees
SY-STI
Action details
Comments
Evaluate the beneficial impact of a tungsten shield to reduce the total dose on the IR8 warm compensators.
Action information
Completed ?
From LMC
429
Assignees
SY-STI
Action details

Triplet task force mandate presented then.

Comments
Update the LMC on progress with the TDE related findings in March 2022.
Action information
Completed ?
From LMC
426
Assignees
SY-STI
Action details
Comments