Validate the recent QPS system changes during the 2025 HWC campaign.
Action information
Completed ?
From LMC
499
Assignees
BE-OP TE-MPE MP3
Action details
Comments
Report back the final 2025 schedule and the updated 2026 draft.
Action information
Completed ?
From LMC
497
Assignees
BE-OP
Action details
Comments
Prepare a plan for an optimal use of the machine time if the repair of the compressor in Point 6 has to be performed sooner than currently scheduled.
Action information
Completed ?
From LMC
492
Assignees
BE-OP
Action details

In Machine Status contribution, proposal presented by MSC.

Comments
Commission blindable BLMs in the injection region (Point 2 and /оr 8).
Action information
Completed ?
From LMC
486
Assignees
BE-OP SY-BI
Action details
Comments
Explore the possibility to verify SPS transverse bunch oscillation before extraction to the LHC.
Action information
Completed ?
From LMC
484
Assignees
BE-OP
Action details
Comments
Schedule an X-rays analysis of the IR5 RF finger warm modules at the earliest opportunity.
Action information
Completed ?
From LMC
466
Assignees
TE-VSC EN-ACE BE-OP
Action details
Comments
Agree on the notification line for removing the movable BLMs in the TCLD.A11R2.B1 and TCLD.A11L2.B2 regions before large equipment transport.
Action information
Completed ?
From LMC
459
Assignees
SY-BI BE-OP EN-HE
Action details
Comments
Clarify the scenarios for which the ALICE and LHCb magnets should be turned off, or kept on, in case of electrical load shedding or longer stops of the LHC.
Action information
Completed ?
From LMC
451
Assignees
BE-OP
Action details
Comments
Schedule the MD to explore the magnet quench margin.
Action information
Completed ?
From LMC
449
Assignees
LSWG BE-OP
Action details
Comments
Define YETS duration and date for the 2023 restart.
Action information
Completed ?
From LMC
448
Assignees
EN-ACE BE-OP LMC
Action details
Comments