SY-RF

SY-RF

Investigate the preventive exchange of 2 burst discs during TS1.
Action information
Completed ?
From LMC
463
Assignees
SY-RF EN-ACE RF Burst Disc Task Force
Action details
Comments
Update on the best estimate for the conditioning duration by September 16๐‘กโ„Ž.
Action information
Completed ?
From LMC
448
Assignees
SY-RF
Action details
Comments
Report back on the ferrite inspection and the plans on the circulators preventive maintenance (before the YETS).
Action information
Completed ?
From LMC
445
Assignees
SY-RF
Action details

Action closed after email conversation of 2023.01.31 (see below).

Hi Giulia,

Comments
Carry out a return of experience analysis on the renaming procedure after a power converter exchange, and report back on the outcome.
Action information
Completed ?
From LMC
444
Assignees
SY-RF SY-EPC
Action details

from Andy Butterworth:

"The procedure for the renaming of the power converter in the RF control system is now documented in the EPC procedure as well as in the RF wiki.
After an exchange of power converter the HL RF piquet will contact an RF controls expert to make the change. No other controls modifications (LSA etc.) are necessary."

Comments
Discuss on the grounding necessity, and whether it should be performed on May 9-11.
Action information
Completed ?
From LMC
438
Assignees
TE-CRG BE-ICS SY-RF BE-OP
Action details
Comments
Report back on progress at the next LMC on April, 13th.
Action information
Completed ?
From LMC
436
Assignees
SY-RF
Action details
Comments
Once the first high efficiency klystron prototype has been successfully tested, define a strategy for replacing operational or spare klystrons with high efficiency ones.
Action information
Completed ?
From LMC
432
Assignees
SY-RF HL-LHC CONS
Action details
Comments
To define a new date for the SR4 transformer replacement (after the Pilot Beam Test).
Action information
Completed ?
From LMC
422
Assignees
EN-EL BE-OP EN-ACE SY-RF
Action details
Comments
Report back on the America RF module performance and the final proposal for the Asia RF module pumping cross exchange (after the Pilot Beam Test).
Action information
Completed ?
From LMC
417
Assignees
SY-RF
Action details
Comments