Study the radiation levels at the PICv2 installation in UA83-87 and identify whether mitigation measures are required. Action information #237 Action Completed ? From LMC 526 Assignees R2E MCWG Action details Comments
Report on observed vacuum activities in IR4 (5R4.B2) and its correlation with measured dose. Action information #118 Action Completed ? From LMC Assignees TE-VSC R2E LBOC Action details Added LBOC a posteriori as they follow up for the LMC. Comments