Verify temperature monitoring procedures and intensity limits during the beam commissioning phase in the present LHCb configuration without the VeLo Side A.

Verify temperature monitoring procedures and intensity limits during the beam commissioning phase in the present LHCb configuration without the VeLo Side A.
Action information
Completed ?
From LMC
435
Assignees
TREX
Action details
Comments