Prepare a plan for an optimal use of the machine time if the repair of the compressor in Point 6 has to be performed sooner than currently scheduled.

Prepare a plan for an optimal use of the machine time if the repair of the compressor in Point 6 has to be performed sooner than currently scheduled.
Action information
Completed ?
From LMC
492
Assignees
BE-OP
Action details
Comments