BE-CEM

BE-CEM

Revisit the safety procedures of the BLM validation campaign in view of autonomous TIM operation.
Action information
Completed ?
From LMC
426
Assignees
BE-CEM BE-OP LHC CSAP HSE-RP
Action details
Comments
Produce a planning for a combined TIM and battery BLM test campaign in view of the Pilot Beam Test and Run3, reporting back to the LMC with the final proposal.
Action information
Completed ?
From LMC
423
Assignees
SY-BI BE-CEM EN-ACE BE-OP
Action details
Comments
Report back on the B1V and B2V goniometer post-mortem tests.
Action information
Completed ?
From LMC
413
Assignees
SY-STI BE-CEM
Action details

Marco Calviani (2021.07.16): "I would move this to Feb/Mar 2022, as the new gonios are planned to be installed during YETS21-22. We give priority to the installation of the equipment and then we will do the post-mortem. It may take a while depending on whether there is any “major” culprits or we have to take some time to analyze their behavior."

 

This was closed ex officio by the Chairs on the 1 June 2023: the action was superseded by the recent problem with the new crystal collimator and, to optimize the resources, it was decided to close it.

Comments