TE-MSC Report back with an update on the triplet lifetime radiation studies. LHC Machine Committee (LMC #439) LHC Machine Committee (LMC #449) 84
Collimation team Report back on the aperture implications of the 15 mm “open” set-point of the LHCb Velo. LHC Machine Committee (LMC #438) LHC Machine Committee (LMC #439) 80
TE-CRG, BE-ICS, SY-RF, BE-OP Discuss on the grounding necessity, and whether it should be performed on May 9-11. LHC Machine Committee (LMC #438) LHC Machine Committee (LMC #440) 81
LMC Chairs Follow-up on the strategy for UPS batteries containing non flame-retardant monoblocs used elsewhere at CERN. LHC Machine Committee (LMC #437) LHC Machine Committee (LMC #438) 78
ATS groups All groups to submit and clean-up PLAN activities. LHC Machine Committee (LMC #437) LHC Machine Committee (LMC #438) 79
SY-RF Report back on progress at the next LMC on April, 13th. LHC Machine Committee (LMC #436) LHC Machine Committee (LMC #437) 75
LHCb collaboration Report back on the LHCb VeLo status and installation plan at the next LMC on April, 13th. LHC Machine Committee (LMC #436) LHC Machine Committee (LMC #437) 76
BE-OP Circulate to the LMC members a machine status by April, 6𝑡ℎ reporting on progress with the machine checkout and the LHC RF recovery, and providing an update to the schedule. LHC Machine Committee (LMC #436) LHC Machine Committee (LMC #437) 77
ATS groups Provide all cabling request for YETS 2022/23 to EN-EL by May 13𝑡ℎ, 2022. LHC Machine Committee (LMC #435) LHC Machine Committee (LMC #436) 73
TREX Verify temperature monitoring procedures and intensity limits during the beam commissioning phase in the present LHCb configuration without the VeLo Side A. LHC Machine Committee (LMC #435) LHC Machine Committee (LMC #440) 74
Run 3 Coordinators Update baseline Run 3 LHC schedule and LS3 overview. LHC Machine Committee (LMC #434) LHC Machine Committee (LMC #437) 70
LMC Chairs Creation of a LHC triplet lifetime task force. LHC Machine Committee (LMC #434) LHC Machine Committee (LMC #449) 71
MPP Followup of the MP implications of luminosity levelling, and report back on the results to the LMC. LHC Machine Committee (LMC #434) LHC Machine Committee (LMC #443) 72
TE-MSC Report on the inspection of diodes of the spare magnets in the FLEX building. LHC Machine Committee (LMC #424) LHC Machine Committee (LMC #451) 43
HWC team Following the RQTL7.R3.B1/B2 non-conformity, investigate possible improvements to the Hardware Commissioning procedure to allow the detection of similar problems in the future. LHC Machine Committee (LMC #427) LHC Machine Committee (LMC #454) 49
TE-MPE Following the RQTL7.R3.B1/B2 non-conformity, put in place improvements to the NC follow-up procedure to avoid such issues in the future. LHC Machine Committee (LMC #427) LHC Machine Committee (LMC #454) 50
ATS management Define the strategy to address the QQBI.21L3 PIM non-conformity. LHC Machine Committee (LMC #427) LHC Machine Committee (LMC #428) 51
SY-EPC, EN-ACE Define the applicability of ARRs to power converter exchanges. LHC Machine Committee (LMC #427) LHC Machine Committee (LMC #454) 52
EN-ACE Circulate the ARR documents for comments and eventual approval. LHC Machine Committee (LMC #427) LHC Machine Committee (LMC #454) 53
TE-VSC, BE-ABP Investigate any anomalous loss patterns from the Pilot Beam Test to possibly identify similar issues elsewhere than 21L3. LHC Machine Committee (LMC #428) LHC Machine Committee (LMC #429) 54
MP3 Report back in due time on the quench training analysis. LHC Machine Committee (LMC #414) LHC Machine Committee (LMC #422) 14
TE-VSC, EN-ACE Follow-up of the proposed mitigation measures to minimize the risk of accidental venting of the LHC vacuum sub-sectors. LHC Machine Committee (LMC #412) LHC Machine Committee (LMC #470) 8
BE-ICS, EN-ACE Define with the concerned groups a plan for the interventions and mitigations of the Schneider M580 PLC issues - after the LHC schedule is updated at the discussion with the experiments on March 15th. LHC Machine Committee (LMC #412) LHC Machine Committee (LMC #425) 9
BE-ABP Confirm nominal current for RQ6.R2. LHC Machine Committee (LMC #426) LHC Machine Committee (LMC #427) 46
BE-CEM, BE-OP, LHC CSAP, HSE-RP Revisit the safety procedures of the BLM validation campaign in view of autonomous TIM operation. LHC Machine Committee (LMC #426) 47
SY-STI Update the LMC on progress with the TDE related findings in March 2022. LHC Machine Committee (LMC #426) LHC Machine Committee (LMC #435) 48
SY-STI, BE-CEM Report back on the B1V and B2V goniometer post-mortem tests. LHC Machine Committee (LMC #413) 6
LBOC Report back - before June 7th 2021 - on the updated Pilot Beam Test schedule. LHC Machine Committee (LMC #413) LHC Machine Committee (LMC #416) 7
TE-VSC Report the results of the measurements in the cryogenic SEY/XPS setup when available. LHC Machine Committee (LMC #411) LHC Machine Committee (LMC #444) 10
BE-ABP, BE-GM, EN-ACE, TE-MSC Follow-up of the 11L4 misalignment in Sector 34 and its potential impact on the machine aperture. LHC Machine Committee (LMC #409) LHC Machine Committee (LMC #410) 12
BE-ICS Report back on cryo PLCs related problems LHC Machine Committee (LMC #409) LHC Machine Committee (LMC #412) 13
BE-ICS Update report of the M580 PLC failure rate in 6 months time. LHC Machine Committee (LMC #425) 44
SY-BI Update on the progress of the BLM testing campaign by December 2021. LHC Machine Committee (LMC #425) LHC Machine Committee (LMC #430) 45
EN-ACE, BE-OP Update the LS2 and YETS schedules to be consistent with the 6.8 TeV energy target. LHC Machine Committee (LMC #419) LHC Machine Committee (LMC #421) 27
MPP, LBOC Follow-up of the luminosity levelling strategy in 2022 and its staging by taking into account operational and Machine Protection constraints. LHC Machine Committee (LMC #419) LHC Machine Committee (LMC #443) 28
TE-MSC Update the estimated peak dose limits of the inner triplet and correctors magnets. LHC Machine Committee (LMC #419) LHC Machine Committee (LMC #449) 29
BE-ABP Analysis of degraded performance scenarios in case of triplet corrector failures. LHC Machine Committee (LMC #419) LHC Machine Committee (LMC #449) 30
MP3 Report back on the autopsy of the faulty diode in MB.A23R2. LHC Machine Committee (LMC #418) LHC Machine Committee (LMC #424) 23
MP3 Report back on observations on flattop quenches during the Sector 45 plateau test. LHC Machine Committee (LMC #418) LHC Machine Committee (LMC #422) 24
IT Management, BE Management Review with the relevant BE and IT teams the technical, planning and resource constraints for the deployment of Option 4. LHC Machine Committee (LMC #418) LHC Machine Committee (LMC #442) 25