EN-CV Report back on dump window leak tests and updated installation plans. LHC Machine Committee (LMC #433) LHC Machine Committee (LMC #434) 66
AION-100 collaboration Present an ECR for the probe installation in the PX46 shaft. LHC Machine Committee (LMC #433) LHC Machine Committee (LMC #435) 67
EN-CV Report on the results of the water pollution analysis in Point 4. LHC Machine Committee (LMC #433) LHC Machine Committee (LMC #434) 68
HL LHC PSO Report back on the decision taken following the request to disable the UPR air-suction-type detectors in Point 1 and 5. LHC Machine Committee (LMC #433) LHC Machine Committee (LMC #434) 69
SY-RF, HL-LHC, CONS Once the first high efficiency klystron prototype has been successfully tested, define a strategy for replacing operational or spare klystrons with high efficiency ones. LHC Machine Committee (LMC #432) LHC Machine Committee (LMC #503) 62
LHC CSAP Evaluation of the implications of the proposed change of the UX451 access system. LHC Machine Committee (LMC #432) LHC Machine Committee (LMC #455) 63
EN-AA Report on whether dust may affect the ODH sensors efficiency. LHC Machine Committee (LMC #432) LHC Machine Committee (LMC #433) 64
BE-GM, EN-ACE, TE-CRG Improve the planning of future LHC alignment campaigns of cold components. LHC Machine Committee (LMC #432) LHC Machine Committee (LMC #433) 65
EN-ACE Follow-up on the cause of the Point 5 evacuation alarm on November 30th 2021. LHC Machine Committee (LMC #429) LHC Machine Committee (LMC #430) 55
EN-EL Follow-up on the recent UPS incidents. LHC Machine Committee (LMC #429) LHC Machine Committee (LMC #430) 56
LBOC Follow-up the 10 Hz oscillations studies, by evaluating the specificity of the Q6R2 and its operational settings and investigate possible mitigation measures. LHC Machine Committee (LMC #429) LHC Machine Committee (LMC #478) 57
LBOC Based on Run 2 statistics, analyze the probability and consequences of accidental head-on collisions in LHCb and, if possible, put in place actions to limit them in future. LHC Machine Committee (LMC #429) LHC Machine Committee (LMC #462) 58
SY-STI Evaluate the beneficial impact of a tungsten shield to reduce the total dose on the IR8 warm compensators. LHC Machine Committee (LMC #429) LHC Machine Committee (LMC #449) 59
7 TeV Task Force Update on the predicted duration of the training in Sector 56 based on the latest observations. LHC Machine Committee (LMC #421) LHC Machine Committee (LMC #424) 33
BE-ABP Evaluate the impact of the presently observed misalignment of the LHC lattice components on the machine apertures LHC Machine Committee (LMC #410) LHC Machine Committee (LMC #452) 11